The €600 million N25 Waterford bypass scheme was quite complex and involved the construction of 23.1km of high quality dual carriageway, 9.6km of single carriageway, grade separated and at-grade junctions, a cable stayed river bridge, a toll plaza and 60 structures. 

TMS carried out over 50 road safety audits at all stages of the project from preliminary design, to detailed design and through to completed construction (i.e. Road Safety Audit Stages 1, 2 and 3), which required close co-operation between all organisations involved.